Period
2016 – 2020
Client
China State Construction Engineering (HK) Limited
Chinese University of Hong Kong Medical Centre Limited
Site Location
TSWTL 23, Tin Shui Wai
Scope of Works
Full 3D Modeling
4D Simulation
Contraction Progress Tracking
Change Management
Full Drawing Production
5D TKO
FM-BIM Integration
Software Involved
You must be logged in to post a comment.